Single Phase AC Diesel Generators

A: Test before shippment

- Each Generator Set shall be put into commission more than 4 hours totally, tested on idle load, fully load and 10% overload.
- Noise level shall be tested.
- All of the meters on the control panel shall be tested.
- The appearance of the Set and the label, nameplate shall be tested. "
-Voltage available: 50Hz: 380-400-415V/ 220-230-240V; 60Hz: 220-380-416-440-480V/ 110-208-220 240V. Any special voltage is also available as cilent's request.

B: Packing & Warranty
- Packing: Wooden Case, Plywood or Metal Case.
- Delivery Time: Less than 25 working days after receiving prepayment.
- Warranty: One year or 1, 000 hours from the date of shippment
(15 Months or 1, 200 hours for Alternator Part).

C: Control System:
1, Basic control system, the basic type control system is provided with a current meter, a volmeter, a frequency meter, an oil pressure guage, a water thermometer and indicator lights on the control cabinet and 4 additional protection fuctions are to be provided as required by customers.
2, AST (Automatic Start Type Control System), Optional Automatic Start Type System is provided When there is an interruption in the commercial power supply (or there is a start signal in other generator sets), this generator set will, subject to time delay acknowledgement (0-30 S adjustable), be automatically started (1-8 times adjustable). In addition, it is provided with a basic protection function and digital or meter indication of voltage, current, frequency and rotation speed parameters.
3, ATS (Automatic Transfer System), The optional system is provided with a fully automatic transfer switch, a control electric apparatus and an indicator light on the control panel and is coordinated with an automatic type contral cabinet, thus serving the fuction of automatic changeover between the power supplied by the grid and the power generated by the genset.

4, Sync Parallel Control System, this control system can connect 2 or 3 or 4 gensets to make more larger power. such as: if you want 1000kw power, y